290/130 Flyovers Project

Construction Information

Construction Information and Travel Impacts* 

SUN (10/25) through SAT (10/31) 9 p.m. – 5 a.m. and MON (10/26) through SAT (10/31) 9 a.m. – 3 p.m. On southbound SH 130, there will be alternating closures of exits 436 and 437A. When the Parmer Lane exit (exit 436) is closed, use the exit to US 290 (Exit 437A) and the signalized intersection to access Parmer Lane. When the exit for US 290 (exit 437A) is closed, use the Parmer Lane exit (exit 436) to access the frontage roads to access US 290.

SUN (10/25) through SAT (10/31) 9 p.m. – 5 a.m. On southbound SH 130, there will be lane closures between Parmer Lane and Blue Bluff Road. Use caution while driving.

SUN (10/25) through SAT (10/31) 9 p.m. – 5 a.m. and MON (10/26) through SAT (10/31) 9 a.m. – 3 p.m. There will be lane closures on westbound US 290 frontage road from SH 130 to Harris Branch Parkway. Use caution while driving.

SUN (10/25) through SAT (10/31) 9 p.m. – 5 a.m. On northbound SH 130, there will be lane closures from Blue Bluff Road to exit 437A and exit 437B will be closed. Use exit 437A to access the frontage road system and the signalized intersection to travel westbound on US 290.

SUN (10/25) through SAT (10/31) 9 p.m. – 5 a.m. There will be lane closures on southbound SH 130 frontage road between Parmer Lane and US 290. The southbound on-ramp for SH 130, located south of US 290, will also be closed. For those traveling south on SH 130 or eastbound on US 290, use Parmer Lane to bypass construction and travel south on SH 130.

MON (10/26) through SAT (10/31) 9 a.m. – 3 p.m. On eastbound US 290 frontage road, there will be lane closures between Harris Branch and SH 130. Use caution while driving.

SUN (10/25) through SAT (10/31) 9 p.m. – 5 a.m. The eastbound US 290 frontage road will be closed between Harris Branch and SH 130. Follow the roadway onto US 290 mainlanes and use the turnaround at Gregg-Manor Road to access US 290 westbound frontage road and signalized intersection to access SH 130. To travel south and bypass construction, use Harris Branch Parkway to turn left onto Lindell Ln and left onto Blue Bluff Rd to access SH 130. Detour map available. Note: Toll gantries will be turned off to accommodate detoured drivers and this work will not occur simultaneously with the full closure of US 290 mainlanes.

SUN (10/25) through SAT (10/31) 9 p.m. – 5 a.m. There will be lane closures on eastbound US 290 mainlanes between Parmer Lane and west of Harris Branch. Use the frontage road system to bypass construction.

MON (10/26) through SAT (10/31) 9 a.m. – 3 p.m. There will be lane closures on southbound SH 130 frontage road between Parmer Lane and US 290. Use caution while driving.

SUN (10/25) through SAT (10/31) 9 p.m. – 5 p.m. On southbound SH 130, the direct connector to westbound US 290 will be reduced to one lane. To by-pass construction, use the Parmer Lane exit (exit 436) to access the frontage roads and travel westbound on US 290.

SUN (10/25) through SAT (10/31) 9 p.m. – 5 a.m. There will be lane closures on westbound US 290 mainlanes between Harris Branch and SH 130. Use the frontage road system to bypass construction.

*Dates are subject to change based on weather and other circumstances.